Hello,<div><br></div><div>If I have epochs that have overlapping data points (e.g. the end of the previous epoch were the same data points for the baseline period of the next epoch) and assume that i don't use the continuous data but carry on to do the "epoch-wise" ICA, would this make the result of the ICA invalid?</div>
<div><br></div><div>Thanks!</div><div><br></div><div>Eric</div>